Werley Kitchen, Minnetonka, MN

The back side of the mosaic mural. Each separate piece is numbered to correspond with the final layout design. The mural mosaic is then glued together with a fabric mesh and stone adhesive. This particular piece is unique in that it was mesh-backed and grouted on the surface in studio, then mounted on the cooktop wall in one finished piece. The marble frame was added on location. Total installation time: 1 hour.
Singapore
Tailor my experience with cookies

Houzz uses cookies and similar technologies to personalise my experience, serve me relevant content, and improve Houzz products and services. By clicking ‘Accept’ I agree to this, as further described in the Houzz Cookie Policy. I can reject non-essential cookies by clicking ‘Manage Preferences’.