Stephen Graver - Wellow Project
The brief was to have a shower, bath, WC and twin basins on a vanity unit. The room was previously a bedroom so no services were in the room. New services, including connections to the mains drainage and installing hot and cold water supplies, were installed. Re-plastering was carried out completely. New engineered oak flooring was laid with electric under floor heating.